Photos from Saturday 16th Build Day January 16, 2016 Bryan Dierking The parachute is pictured with the singeing we intend to repair. The Recovery structure, behind the parachute, is nearly completed and awaiting paint. The FFFF black powder charges prepped and shunted prior to testing. Jansen holding the charge bulkhead prior to testing. Nixon Carruthers' preliminary design for the port covers we need. We should have a print to play with by tomorrow.